Wellington sur le Bassin

Customer
Édyfic Construction
Location
Montreal
Timeline
2022-2024
Multifamily

Built by Bastium Construction, Wellington sur le Bassin is located near the Peel Basin and is the fourth residential tower in District Griffin, Devimco Immobilier’s mixed-use project. Wellington sur le Bassin will include 380 new condos and next in a line of distinguished builds that includes the Hexagone, St Ann, and MaryRobert projects, which are all part of one of Montreal’s most ambitious real estate developments.

Our task

ORAM was contracted to install the following plumbing systems:

  • Sanitary drainage system
  • Rainwater drainage system
  • Domestic cold water piping
  • Centralized hot water system
  • Natural gas piping

ORAM Expertise

Our team leveraged our expertise and suggested design modifications that would optimize the hot and cold water distribution systems and drainage to reduce project costs.

  • Distribution method and pipe layout
  • Pressure management
  • Specialized equipment proposals

Statistics

1,331
total units in the District Griffin project
6,000
total taps