![](https://orammdb.com/wp-content/uploads/2022/05/Wellington-Bassin-1.jpg)
Wellington sur le Bassin
Customer
Édyfic Construction
Location
Montreal
Timeline
2022-2024
Built by Bastium Construction, Wellington sur le Bassin is located near the Peel Basin and is the fourth residential tower in District Griffin, Devimco Immobilier’s mixed-use project. Wellington sur le Bassin will include 380 new condos and next in a line of distinguished builds that includes the Hexagone, St Ann, and MaryRobert projects, which are all part of one of Montreal’s most ambitious real estate developments.
![](https://orammdb.com/wp-content/uploads/2022/05/Wellington-Bassin-1.jpg)
Our task
ORAM was contracted to install the following plumbing systems:
- Sanitary drainage system
- Rainwater drainage system
- Domestic cold water piping
- Centralized hot water system
- Natural gas piping
ORAM Expertise
Our team leveraged our expertise and suggested design modifications that would optimize the hot and cold water distribution systems and drainage to reduce project costs.
- Distribution method and pipe layout
- Pressure management
- Specialized equipment proposals
Statistics
1,331
total units in the District Griffin project
6,000
total taps
![](https://orammdb.com/wp-content/uploads/2022/05/Wellington-Bassin-2.jpg)
![](https://orammdb.com/wp-content/uploads/2022/05/Wellington-Bassin-3.jpg)