For this project, we were contracted to complete all the plumbing work to put in a neighbourhood supermarket on the ground floor of the phase 2 building of the multifamily Quartier Jean-Nicolet building project, which we completed between 2019 and 2021 with our partner CONSTRUGEP.

Our task

ORAM was contracted to install the following plumbing systems:

  • Sanitary drainage system
  • Rainwater drainage system
  • Domestic water piping
  • Natural gas piping

ORAM Expertise

Our expertise allowed us to overcome the challenges involved in putting in a commercial space on the ground floor of a multifamily building (mix-used project):

  • Coordinated the design and construction of the main drainage lines for the grocery store as well as the multifamily project.
  • Coordinated putting the plumbing through the structural concrete slab on the ground floor rather than through a slab-on-ground that would typically be used for a grocery store.

Statistics

30,000
ft2
20
food counters with drains