Place Frontenac

Customer
Jadco
Location
Pointe-Claire
Timeline
2022-2024
Multifamily

This new residential Jadco Construction project is being built on the site of a commercial area at the corner of Boulevard Brunswick and Avenue Revcon in Pointe-Claire. The existing commercial spaces, also called Place Frontenac, will be demolished to make way for four new residential towers. Phase 1 will include 245 new units across 11 storeys.

Our task

ORAM was contracted to install the following plumbing systems:

  • Sanitary drainage system
  • Rainwater drainage system
  • Domestic cold water piping
  • Centralized domestic hot water system
  • Natural gas piping

ORAM Expertise

We worked closely with an engineering firm on the following elements and systems, with the goal of achieving the highest client value at the lowest possible cost:

  • Sanitary drainage system, rainwater drainage system, and domestic water supply system
  • Correct boiler sizes for the domestic hot water system
  • Pressure management

Our expert team also helped select the final fixtures:

  • Specialized equipment suggestions
  • Fixture suggestions
  • Pipe insulation quote

Statistics

41,000
feet of drainage pipes
1,226
taps