Liveo Pointe-Claire
Customer
Sotramont Construction
Location
Pointe-Claire
Timeline
2019-...
This three-phase development project by Sotramont Construction is located near the intersection of Hymus and Saint-Jean boulevards in Pointe-Claire. When completed, it will have 467 rental condos in towers that will be among the tallest in Pointe-Claire. So far, we’ve completed the first two phases.
Our task
ORAM was contracted to install the following plumbing systems:
- Sanitary drainage system
- Rainwater drainage system
- Domestic water piping
- Natural gas piping
- Generator fuel system
ORAM Expertise
To help reduce project costs, we met with the developer and suggested having just one service room and booster pump for all three phases. We also helped optimize:
- Distribution method and pipe layout
- Pressure management
- Specialized equipment proposals
- Trade coordination
Statistics
234
gpm of drinking water
1,700,000
BTUs/hour for water heating