District Muller

Customer
Dinamo Construction
Location
Saint-Jérôme
Timeline
2023-2024
Multifamily

This 3rd phase of the District Muller project is being built by Dinamo Construction. Located on the former lands of the Muller company, in Saint-Jérôme, this project with a unique signature features modern architecture. Occupants of the 117 rental apartments will be able to benefit from a swimming pool, a gym, a billiard room, without forgetting the numerous green spaces and play areas.

Our Task

Our mandate consists of supplying and installing the following plumbing networks and systems:

• 1 Sanitary drainage network
• 1 storm drainage network
• 1 domestic cold water network
• 1 centralized domestic hot water network
• 1 Natural gas network

Our expertise

Our team’s mandate is to supply and install the plumbing networks and systems, but it is also involved in different ways in order to reduce the costs of the project, in particular by offering.
In order to reduce project costs, our team proposed an optimal budget, which made the difference in terms of:

• In the selection of materials used
• In the proposal of specialized specialized equipment
• In the proposal for the insulation quote

Statistics

18877
sq.ft. of living space
454
indoor parking lots for all phases