This new apartment complex is being built by Dinamo Construction just steps from the Concorde intermodal station and 2 kilometres from Place Bell and Collège Montmorency. It will have a total of 389 units across 3 towers and amazing resident amenities, including an inner courtyard and an outdoor pool with a pool house and cabanas.
Our task
ORAM was contracted to install the following plumbing networks and systems:
- Waste lines
- Rainwater drainage system
- Domestic cold water piping
- Centralized hot water system
- Natural gas piping
ORAM Expertise
Our team worked to optimize project costs by helping to finalize the following:
- Hot and cold water distribution systems and drainage system
- Distribution method and pipe layout
- Pressure management
- Specialized equipment proposals
- Fixture suggestions
Statistics
477
bathrooms
113,800
litres of rainwater to drain in 15 minutes